Browse all practice questions for the BNSF Local Employee Training Program (LETP) Practice Exam. Search by topic, open any question and review its full explanation, then test yourself in the practice quiz.

BNSF Local Employee Training Program (LETP) Practice Exam course image
More practice questions

These questions are part of the practice quiz. Start practicing

  • What is the BNSF commitment to diversity and inclusion within LETP?
  • When is it permissible to turn off the headlight of a train?
  • What method is utilized for hands-on training in LETP?
  • What is the maximum independent brake cylinder pressure allowed on locomotives with clasp-type brake shoe rigging?
  • What is the role of the supervisor in the LETP?
  • What is the standard brake pipe pressure for yard or freight service?
  • What is a critical component of the LETP for new hires?
  • What is the maximum allowable speed deviation during a speed indicator check at speeds below 30 MPH?
  • What indicates that the Air Flow Method test is complete?
  • What key principle is emphasized in BNSF's safety culture?
  • Which of the following reflects the training approach used in LETP?
  • When should a defective speed indicator be reported?
  • When must a train proceed prepared to stop at the interlocking signal while approaching an automatic interlocking?
  • At what speed must a train proceed if the previous signal indication is unknown?
  • Who should employees contact if they have concerns about the training program?
  • What should a crew do if they detect flat spots while moving?
  • Why is understanding company policies crucial in the LETP program?
  • What system component is crucial for controlling brake pipe pressure?
  • What must happen for train operations to resume after a yellow-red flag situation?
  • Which dynamic brake system is known to provide braking power relative to speed and dynamic handle position?
  • Which locomotives should have independent brakes cut-in?
  • How can employees contribute to the content of the LETP?
  • What is the maximum independent brake cylinder pressure allowed on a locomotive with single shoe per wheel brake rigging?
  • What should an employee do if a red flag is not displayed?
  • Which condition is considered a safety hazard while trailing with cars?
  • Who is responsible for implementing the LETP?
  • If a train is delayed in a block, what is the required action according to procedures?
  • What should a train do if the previous indication is unknown?
  • What is indicated by one defective headlight on a vehicle?
  • What must crew members provide during shoving movements unless relieved by specific instructions?
  • What is required of the lead controlling locomotive for dynamic brakes to function properly?
  • At what speed must a locomotive have an operative speed indicator?
  • What is meant by initiating movement between signals?
  • What are the two acceptable methods for testing the brake system for leakage?
  • What is the indication for sounding the whistle signal (7) when approaching public crossings?
  • Draft forces are present when a train is in which condition?
  • What is the appropriate response if an engineer finds the speed is not accurate by the set limits during a check?
  • What scenario triggers the need for an Application and Release Air Brake Test (Class 3)?
  • In dynamic braking, what percentage of maximum retarding force should be applied when passing disturbed track areas?
  • What action should be taken if the whistle fails during operation?
  • What is the procedure for reporting a training completion?
  • How does LETP ensure compliance with regulations?
  • When the automatic brake valve handle is in the release position, where is air for charging supplied from?
  • How does the LETP support career advancement?
  • Under what condition can a train back up on any main track to pick up a crew member?
  • Under which condition can the speed be increased when a yellow-red flag is present?
  • What are the primary factors determining the number of cars requiring hand brakes?
  • What is the required air test before putting a train together at its initial terminal?
  • What is required when a train is moving in the opposite direction from which the block was entered?
  • How should a train proceed when its speed is reduced below 25 mph while approaching an automatic interlocking?
  • What must you check for during the initial movement of a locomotive that is not coupled to other equipment?
  • What is the main goal of safety training in LETP?
  • What must be closely observed to determine if any leakage occurs in the brake system?
  • If the signal giver for shoving a train disappears, what should employees do?
  • What is the significance of continuing education in LETP?
  • When initially moving a locomotive consist coupled to other equipment, what occurs if braking is detected on trailing locomotives?
  • Which aspect of LETP helps in maintaining workplace safety?
  • When yard limits fall within CTC territory, how is movement authorized on the main track?
  • What is one factor that does NOT contribute to the requirement of hand brakes on cars?
  • What is the maximum speed for shoving cars or engines on a controlled siding for passenger trains?
  • Which of the following is NOT part of the steps to restore operating controls?
  • What should a train do if it is delayed in block in CTC or manual interlocking limits?
  • What action should be taken during a full service brake application?
  • How long should one wait after stopping before placing the auto brake valve handle in the release position?
  • Why is collaboration emphasized in LETP training?
  • What is the maximum allowable brake pipe pressure for trains consisting entirely of business or passenger cars?
  • What initial step must be taken during an Intermediate Air Brake Test?
  • During the air brake test, what should you check after making a 10-psi brake pipe reduction?
  • During which weather conditions is a Running Air Brake Test particularly crucial?
  • What is required to maintain slack condition while stopping?
  • When is a brake pipe leakage test required?
  • How long must brakes remain applied to pass a retest of the Transfer Train Air Brake Test?
  • What is the significance of employee feedback in the LETP?
  • What is the procedure if a red flag is displayed?
  • Which component indicates that the air brake system is functioning properly during tests?
  • What signifies a need to sound the whistle intermittently after the initial warning signal (8)?
  • How long should the independent brake valve be actuated prior to a brake pipe reduction?
  • What speed must a train not exceed if there is a loss of front to rear communication while enroute?
  • How is the automatic brake valve handled during the leakage test?
  • What should a train do if it stops or its speed is reduced below 10 mph after entering a block on a proceed indication in ABS Territory?
  • What is a key focus area for freight train operations training in LETP?
  • What must be obtained before making reverse movements on controlled tracks?
  • What might suggest inefficiency in speed indicators?
  • How should reverse movements on a main track be conducted?
  • In the context of train operations, what do buff forces indicate?
  • What is a potential issue indicated by windshield wipers not functioning?
  • What are some common topics assessed in LETP evaluations?
  • What indicates that windshield cracks are a safety concern?
  • What must be done first during an inbound train inspection?
  • What should be assessed during an inspection of a speed indicator?
  • What is the limit speed when a locomotive has flat spots that meet specific criteria?
  • At which throttle position does the flat dynamic brake system reach full braking power?
  • In what way does LETP contribute to environmental awareness?
  • What should a train do when it enters a block with no governing signal according to procedures?
  • How are the objectives of the LETP communicated to employees?
  • What is the first step to conduct an Air Flow Method (AFM) test?
  • What is the first step in the reducing locomotive overcharge procedures?
  • Which of the following is NOT considered a non-complying condition for locomotives?
  • How is the effectiveness of LETP training evaluated?
  • When should the automatic brake valve be cut out?
  • What action should be taken if a penalty brake application does not occur during an Alerter Test?
  • What type of skills does LETP aim to enhance among employees?
  • When is a train considered delayed in block?
  • When should a train operator notify maintenance regarding wheel flats?
  • How should movements be made if a train is moving in the opposite direction from which the block was entered?
  • What must you check post movement of the locomotive at 1 to 3 MPH?
  • What should employees do if they identify a safety hazard?
  • How long should the actuating procedure be on a trailing locomotive during initial movement?
  • In a fully charged system, what should the initial brake pipe reduction be?
  • What is one responsibility of trainers within the LETP?
  • Which method is commonly used for assessing knowledge retention in LETP?
  • If a train is delayed in block in ABS territory, what is the next course of action?
  • What type of training might be included for locomotive engineers in LETP?
  • According to Brake Pipe Leakage Method procedures, what is the allowable leakage for the test to be considered complete?
  • What is the generally acceptable change in psi needed to confirm either application or release of the brakes at the rear of the train?
  • What is the purpose of the Local Employee Training Program (LETP)?
  • Which of the following trains must undergo a Running Air Brake Test?
  • What is the maximum braking psi when in the Full Service Position?
  • What must trains obtain within yard limits to use the main track?
  • What is the first action taken when the automatic HO is applied during inbound train inspection?
  • During a Transfer Train Air Brake Test, what is the minimum brake system pressure required before making a brake pipe reduction?
  • How long should you actuate the independent brake when initiating an automatic brake application?
  • What are the consequences of failing to complete LETP requirements?
  • What defines "disturbed track"?
  • What is a sign of improper equipment maintenance in a single locomotive?
  • How should multiple brake pipe reductions be spaced during operation?
  • What learning styles does LETP aim to accommodate?
  • What role does technology play in the LETP?
  • How frequently is LETP content reviewed and updated?
  • True or False: Any object waived violently by a person near the track is a signal to stop.
  • What must a train ensure when moving from a controlled area to an uncontrolled area?
  • What is the maximum brake pipe reduction for speed control?
  • How does LETP foster leadership skills among employees?
  • What is the proper handling of the dynamic brake handle in restricted areas?
  • Which of the following is NOT a reason for performing a brake pipe leakage test?
  • What situation necessitates a Class 3 air brake test?
  • How should a train proceed when it enters a block with no governing signal?
  • What is the purpose of the brake pipe reduction during a Running Air Brake Test?
  • What does the Full Service Position do to the equalizing reservoir and brake pipe pressures?
  • When is a locomotive air brake test required on multiple-unit consists?
  • What is the maximum allowable speed for a locomotive with a failed speed indicator to travel?
  • What is an appropriate action when there is a ground relay tripped?
  • Which defect can be identified in the brake system of a single locomotive?
  • What is the maximum speed for shoving cars or engines on a controlled siding for freight trains?
  • What is the acceptable range of speed deviation for a speed check above 30 MPH?
  • What role do simulations and practical exercises play in LETP?
  • How often must employees participate in LETP training?
  • What is the purpose of actuating the independent brake valve before a brake pipe reduction?
  • What action should be taken if flat spots of 2 inches or more are found on a locomotive's wheels?
  • What is the primary function of the regulating valve in a train brake system?
  • What information must be specified to the engineer when using radio communication for shoving movement?
  • What should employees do to prepare for the LETP sessions?
  • What is the independent brake cylinder pressure for a single shoe type?
  • What is one of the training goals for maintenance-of-way employees in LETP?
  • What type of skills does the hands-on training portion of LETP develop?
  • When making split brake pipe reductions for planned slowdowns, what should the initial reduction be?
  • What constitutes a safety risk in relation to cab seats?
  • What is the importance of teamwork in the LETP?
  • If a locomotive has flat spots on wheels longer than 2 1/2 inches, what action should be taken?
  • What common scenarios are practiced during LETP simulations?
  • What follows a full service brake pipe reduction when the automatic brake is applied?
  • Why is it necessary to ensure all angle cocks are left open on standing portions of a train?
  • What is the initial reduction in psi for a proper split reduction when slowing down a train?
  • What is the desired action when stopping a train from an emergency brake application?
  • What is a key benefit of participating in LETP training?
  • What should be done when your train is stopped and operating conditions allow, before releasing the brakes?
  • How does LETP promote a culture of safety among employees?
  • What importance does LETP place on an employee's personal behavior?
  • According to the procedures, what is the first verification after making an initial locomotive movement?
  • What characterizes an "inverse" gradient in train braking?
  • What must the lead locomotive be equipped with on train movements requiring dynamic brakes?
  • What is the first step in reducing pressure in overcharged train brake systems?
  • What is the first step in responding to a yellow-red flag?
  • In which scenario can the headlight be dimmed?
  • What are “job aids” in the context of LETP?
  • How are emergency procedures integrated into LETP training?
  • For which scenario is the Intermediate Air Brake Test (Class 1A) required?
  • Why is feedback important in LETP training?
  • Which action could lead to crew decertification?
  • Which issue is related to operational safety when cars have been off air for more than 24 hours?
  • If no crossing sign is visible, when should the whistle signal be sounded?
  • What is the required action for a train when taking siding?
  • What kind of regulatory compliance is covered in LETP?
  • Which of the following pressures are equalized during an emergency brake application on a freight car?
  • Which of the following enhances decision-making regarding safety in LETP?
  • What should a train do if it needs to pick up a crew member without entering yard limits?
  • What is the focus of refresher courses in LETP?
  • What is the role of accountability in LETP training?
  • What must a crew do if a helper locomotive is added to a train?
  • When must periodic Running Air Brake Tests be performed during inclement weather?
  • What procedure is required when leaving a portion of a train temporarily on the main track?
  • What goal does BNSF strive for in their LETP regarding environmental practices?
  • In the context of LETP, what is the significance of scenario-based evaluations?
  • What is the first step in conducting a locomotive air brake test?
  • What action is taken before cutting out operating controls on a locomotive?
  • When determining the number of hand brakes needed, which factor is considered?
  • If a locomotive inspection reveals non-complying conditions, when can the locomotive be moved?
  • Why does BNSF invest in the LETP program?
  • What is a common form of assessment after LETP training units?
  • When should the whistle signal (8) be used?
  • After reducing brake pipe pressure by 20 psi, how long must you wait before monitoring for leakage?
  • How far from an interlocking signal must a train continue to move prepared to stop?
  • What is required during reverse movements within the same signaled block?
  • During an emergency brake application, what should be done with the independent brake handle?
  • What is an appropriate response to a near-miss incident reported during LETP training?
  • How must movements entering yard limits be made?
  • What safety equipment must be worn during the LETP training exercises?
  • What should trainees prioritize according to LETP regarding their behavior?
  • What action must a train take after entering a block on a proceed indication in CTC or manual interlocking limits when its speed is reduced below 10 mph?
  • When is it acceptable to sound the whistle signal less than 15 seconds before a crossing?
  • What type of forces are present when a train is in a slack-bunched condition?
  • How long must the brakes remain applied during a retest for a car that released its brakes prematurely?
  • What does BNSF stand for?
  • How must trains operate when within view of another train under restricted speed?
  • What must be included in the written or electronic record of the Air Brake Test?
  • What is the first step in the cutting off and recouping airbrake test?
  • What are the steps after attaching a locomotive to a train previously tested with yard air?
  • Under what condition should an emergency brake application be used?
  • What action should be taken after stopping and waiting for freight car vent valves to close?
  • In what manner does LETP promote diversity and inclusion among employees?
  • What type of operations does the LETP address?
  • What can employees expect after completing LETP training?
  • On what types of tracks may a single car be left unattended?
  • How long must a crew retain mandatory directives, including voided ones?
  • When testing the speed indicator, what speed range should be used for accuracy checks?
  • What action should be taken if there is a main track obstruction while returning to a detached portion?
  • Which of the following represents the minimum radio communication requirements during shoving movements?
  • What does the term "normal" gradient refer to in train brake systems?
  • How long must the brake valve handle be in the suppression position to recover control after a penalty brake application?
  • What is the acceptable pressure range for the main reservoir?
  • What is the minimum distance a train should stop from a signal when taking siding?
  • What valve maintains the desired pressure in the brake pipe when the automatic brake handle is in the RELEASE position?
  • How long before reaching a railroad crossing should the throttle be reduced?
  • In ABS territory, how should a train enter the main track from a siding after authority has been obtained?
  • In the Air Flow Method, what must be done if the air flow exceeds 60 CFM?
  • What should be done after making a brake pipe exhaust stop during pressure reduction?
  • What should be activated during an emergency to stop the train?
  • Why is it vital for BNSF employees to understand emergency response actions?
  • What is the primary function of the Handle Off/Continuous Service setting?
  • When charging the air brake system, which of the following is a key point to remember?
  • What is the expected outcome of completing the LETP?
  • What is an outcome of effective communication emphasized in LETP?
  • What must be done if a train is advised of working limits behind them?
  • Which document outlines the safety procedures for BNSF employees?
  • What is one major benefit of online training modules in LETP?
Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy